PT PLN (Persero) - UIP KITRING NUSA TENGGARA - UPP SUMBAWA

Cara Menghitung Head Pompa ( Required Head Pump )

DESIGN CALCULATION HEAD BOILER FEED PUMP




Related article : Siklus PLTU

Data Pompa     :


Head = 7,2 Mpa = 720 meter

Design system ( sesuai heat balance )

- Working pressure = 53 bar = 530 meter
- Elevation drum ( titik tertinggi discharge ) = 24 meter

DESIGN CALCULATION PUMP


Head Total = Hsuction + Hdischarge + Hsystem + Helevasi

1.) Hsuction         =  0 meter ( positive suction )

2.)H discharge


      F = Friction factor pipe ( see moody diagram )
     D = Diamaeter pipe
     v   = Kecepatan air
     g  =  gravitasi

                              Cara membaca moody diagram :


Parameter :
1.       Renoult number 



2.       Relative Roughnes =  e / D
       e = pipe roughness ( mm atau inch )
       d = diameter pipa ( m )

Parameter
      Laminer atau Turbulence
Re < 2000  = Laminer                                 
Re > 4000  = Turbulence
ρ = masa jenis fluida
u = keceptan fluida
d = diameter pipa
µ = viskositas absolut fluida dinamis ( N.s/m2 )


v = viskositas kinematic fluida ( µ / ρ) = 1 x 10 -6 (m2/s) 


Q = 45 m3/jam
D =  3 inch = 76,2 mm = 0,076 m
Q = v.A
A = 3,14 x (0,076)2
      = 0,0181 m2
V = Q / A
   =  45 / 0,0181
   = 2.486 m / jam

  = 0,69 m / s

  • Renoult number

           = 5,24 . 10 8
  • Relative Roughnes =  e / D

                                          =  0,02 / 76
                                          = 2 x 10 -4

Dari tabel moody diatas ditarik garis sehingga ketemu F = 0,015
Jadi friction factor pipa = 0,015

H discharge

              = 4,73 m

  3.)  H system = 53 bar = 530 meter
  4.)  H elevasi = 24 meter


     Head total yg dibutuhkan = 0 + 4,73 + 530 + 24
                                                  = 558 meter
                                                  = 5,58 Mpa 